industrial
Link Lock Factory Building
The brief for this project has not been recorded yet. It will be added from the practice record; nothing on this page is invented for looks.
- Type
- Industrial
- Place
- Aligarh
- Year
- To confirm
- Scale
- To confirm
How an engagement like this runs
An industrial engagement starts from the machinery list, not the elevation. Presentation drawings resolve the process line and its clearances; working drawings set out machinery placement, floor loadings and truck movement; structural drawings carry the bays and the crane or machine foundations; MEP handles power and process water. Supervision then checks the line against the drawing through construction, because a deviation in a process building is a production problem, not just a construction one.
This is the practice’s standing method for the type, not a claim about this project. The stage sequence and payment triggers are on how we work.
Where this record stands
The practice’s archive is being documented project by project. For this entry, the record holds location; still to be documented are year, scale, the written brief, photographs from the practice archive, the client consent that allows story and photographs to publish.
This type of work
Factory buildings and process architecture. Aligarh is a brass-hardware manufacturing centre, and the practice has worked in that industry since 2002.